Where decisions become direction across preconstruction.

As design evolves and assumptions change, ConCntric keeps cost, schedule, and risk aligned—turning planning complexity into coordinated forward momentum.

Managing design, cost, risk, and schedule—all at once.

Preconstruction teams guide projects through design evolution, cost alignment, risk mitigation, and schedule development simultaneously. As decisions multiply, disconnected tools and parallel workflows make alignment harder—and missteps more costly.

ConCntric brings together evolving cost models, value-engineering opportunities, design updates, schedule impacts, and risk considerations into a single, connected platform—so teams stay aligned and make confident planning decisions.

This is what connected preconstruction looks like with ConCntric.

When preconstruction is connected, teams can plan with clarity and act with more confidence.

Evaluate design options instantly and understand the cost and scope impacts

Use Target Value Design (TVD) to keep budgets aligned early

Identify risks sooner with issue and constructability tracking

Build preconstruction schedules that integrate planning, procurement, and estimating

Collaborate with owners and architects using shared
context

Reduce friction by ditching outdated spreadsheets and disconnected tools

The capabilities that power smarter budgeting and planning.

Explore the core capabilities that 
simplify estimate refinement and planning decisions from schematic design through IFC.

Calibrate

Smarter estimating as design evolves

Calibrate provides consistent, structured historical data that helps teams validate estimates, benchmark against past projects, and keep budgets aligned with current market conditions as design evolves.

Helps teams stay ahead with:

Accurate SD and DD estimate updates

Consistent comparisons to historical projects

Baseline cost clarity for evolving design

Cost data aligned to market conditions

ForeSite

See where design decisions are headed

ForeSite looks ahead as design evolves, revealing how today’s decisions are trending—and what they mean for cost, schedule, and constructability before issues surface downstream.

Helps teams stay ahead with:

Early insight into emerging risks and design trends

Forward-looking visibility into cost and schedule implications

Clear signals when design drifts from targets or assumptions

Proactive constructability awareness

Target Value Design (TVD)

Keep design aligned to cost targets

ConCntric keeps design, cost, and scope aligned
from the start—guiding teams toward cost
targets and reducing the need for late-stage value engineering.

Helps teams stay ahead with:

Clear cost guardrails that guide design decisions

Early visibility into misalignment

Structured options when tradeoffs are required

Collaborative decision-making with designers and owners

Timeline

Schedules grounded in design reality

Timeline connects design milestones, progress estimates, and procurement strategy into one evolving plan—so schedules reflect real project conditions, not guesswork.

Helps teams stay ahead with:

Real-time milestone visibility

Early identification of schedule risk

Unified views of cost and time impacts

Integrated planning for long-lead items and permitting

The outcome of connected budgeting and planning

Clear decisions lead to stronger, more predictable project results.

ConCntric helps teams move forward with confidence, reduce disruptions, and deliver more predictable outcomes as projects approach buyout.

We’re the core preconstruction platform that:

Tracked trends across 
SD → DD → CD

Clear, collaborative value-engineering cycles

Proactive risk visibility instead of reactive fixes

Schedules aligned with scope, cost, and key decisions

More predictable outcomes as projects move toward buyout

Keep budgeting and planning aligned when it matters most

ConCntric helps teams turn evolving design into coordinated plans—and confident decisions—through every preconstruction milestone.